19th April:
This morning, i went to the power plant early in the morning (5.30 a.m) to see how the plant start up. The plant is shut down last Saturday because if some signal fault, but sadly, the plant trip again because of the same problem. In this month, the plant already trip for 5 times because of the same problem. The system failed to detect the check back signal for diffusion burner opening.
Today, i helped to overhaul a vertical high pressure pump. Although i got myself in a very dirty condition, but i am very happy because at last i actually learn how to service the pump.